Commissioning is one of the most important stages of the project.
There can be no compromise on the level of safety and quality.
We here at Bosung possess the right equipment, skills, and experience to meet our Client’s needs.
Our service extends from procurement of required commissioning equipment, engineering-to-fit on-site, installation, operation, maintenance, and various testing for safe commissioning.
Category | Equipment | Capacity | Q'ty |
Generator Systems | Diesel Generator | 1200kVA | 10 |
Diesel Transfer Pump Skid | 25㎥/hr | 2 | |
Fuel Storage Tank | 27㎥ | 3 | |
Load Bank | 6000 kVA | 4 | |
Transformer | 5000 kVA | 1 | |
Diesel Transfer pump (with filtering system) | 12㎥/hr | 2 | |
Diesel Oil Tank | 21㎥ | 2 | |
Transformer Container | 5000kVA | ||
Compressor Systems | Air Compresson Package 100HP (Motor Driven) | 9.3㎥/min | 2 |
Air Compresson Package 200HP (Motor Driven) | 19.4㎥/min | 2 | |
Air-Compressor Package (Engine Driven) | 18.5㎥/min | 2 | |
Air Tank | 7.3㎥ | 1 | |
Air Dryer (Desiccant Type) | 1326 N㎥/hr | 2 | |
Air Dryer System | 1800 N㎥/hr | 2 | |
Pump system | Fresh Water Pump Skid | 5,000ℓ/min | 4 |
Booster Pump | 0.16ℓ/min | 2 | |
Supporting Systems | SMC Tank 4.5ton | 27㎥ | 1 |
SMC Tank 5.2ton | 35㎥(water) | 2 | |
Drain Tank | 26㎥(waste water) | 2 | |
Waste Tank | 5㎥ | 1 | |
Portable Testing and Calibration Equipment for PSV | valve diameter:15~400mmDN/ pressure range:0~600 bar | 1 |